Help and questions
Short answers about how Eralis actually behaves. If something here doesn't match what you see, that's a bug worth reporting.
Getting started
- What is a project?
- A project is one timeline and everything attached to it: events, chapters, the people and organisations involved, the sources you cite, and the connections you declare between them.
- You can start from an empty project or from a template. Templates only seed a starting structure — every chapter and event they add is yours to edit or delete.
- I only want a simple list of tasks with dates. Is that possible?
- Yes. When you create a project, choose “Simple planner”. It gives you the same dated list and the same views, but the editor is reduced to a task, a date, a tick box and notes — no chapters, people, sources or connections.
- A planner can be switched to the full timeline editor later from Project settings, and nothing is lost either way.
- What if I only know the year, or only roughly?
- Every event carries its own date precision: exact day, month, season, year, decade, century, or a range. You can also mark a date as approximate, circa, before or after.
- The product never invents a precision you did not give it. An event known only to a decade is displayed as a decade everywhere.
Editing and safety
- Do I have to save?
- No. Changes in the event editor are saved automatically about a second after you stop typing, and the editor tells you whether everything is saved.
- Can I go back to an earlier version?
- Yes. Project settings → History lists every change, including a copy of anything you deleted. Entries that hold a copy have a Restore button that puts the event back as it was.
- Restoring is itself recorded, so you can undo a restore the same way.
- Is anything ever deleted automatically?
- No. Events are never removed because their date has passed, because a plan was downgraded, or on any schedule. Deleting a project moves it to the trash, where it stays until you delete it permanently and confirm.
Publishing and sharing
- Who can see my timeline?
- Nothing is readable by anyone else until you publish it. You choose between private, readable by anyone with the link, or fully public and listed for search engines.
- Events you mark as hidden stay hidden on the public page whatever you choose.
- Can I publish at a specific time?
- Yes. In Project settings → Publish you can set a go-live time and an end time. The public page starts working at the go-live moment and stops at the end time, without you being online.
- Ending a scheduled publication only closes the public link. Your project and its contents are untouched.
- Do visitors need an account?
- No. A published timeline is readable, searchable and presentable by anyone with the link, with no sign-up and no tracking cookies.
Plans and numbers
- What do the analytics show?
- Totals only: how many times a published page was opened, which view was used, a coarse country, the referring site and a device class. Creators never see individual visitors, and nothing is shown if there is no data yet.
- What happens if I downgrade?
- Nothing is deleted. Projects that sit above the new limits stay exactly as they are and stay readable; you simply cannot create beyond the new limit until you are back within it.
- Can I take my work out?
- Any project exports as structured JSON with every event, chapter, person, source and connection, as CSV for spreadsheets, as a standalone web page, as a typeset print/PDF sheet, and as a poster image. Exports are produced in your browser.
Keyboard
- Which shortcuts exist in the editor?
- Ctrl/Cmd + K opens the command palette. N adds an event. / opens search and filters. Ctrl/Cmd + P starts the presentation. Escape closes the editor panel.
- In presentation mode: arrows, space, Page Up and Page Down move between scenes, Home and End jump to the ends, P toggles autoplay, F goes fullscreen and Escape exits.
Looking for the legal side? Privacy, Security and Data export and deletion cover it.